Get in touch with our team to discuss your waste-to-energy project, request technical information, or schedule a consultation.
The X-150 can process a wide range of waste streams including municipal solid waste, agricultural waste (crop residues, bush feed), brewery waste (BSG), wood and forestry waste, sewage sludge, and various industrial wastes. Maximum moisture content is 15%.
From initial consultation to operational deployment typically takes 12-18 months, including feasibility study (2-3 months), engineering and design (4-6 months), manufacturing (6-8 months), and installation/commissioning (2-3 months).
We provide comprehensive research and technology solutions. Our partner MFC provides turnkey equipment delivery. We can also connect you with project developers for Build-Own-Operate models.
SyngaPure™ achieves 94% tar removal using platinum-based catalysts, enabling applications like SOFC fuel cells and SAF production that require ultra-clean syngas. It's been validated through 1,300 operating hours at the Paris facility.
Economics vary by application, but typical payback periods range from 2-5 years depending on waste tipping fees avoided, energy costs, and output products. We provide detailed economic analysis during feasibility studies.
Yes, the Paris COMETHA facility has demonstrated our technology with 1,300 operating hours. We can arrange site visits for serious prospects. We also have active client projects in SAF, brewery, and agricultural applications.